What is the number for your facility?
Three value streams, one page of arithmetic — the same formulas our sales engineers run. Adjust the seven inputs; the report updates instantly and prints cleanly for the slide deck.
- Power efficiency. Cooling optimization toward the 1.25 PUE target.
- Stranded power. Unused contracted capacity identified, avoided, or resold.
- Risk reduction. One major incident avoided per year, plus extended hardware life.
Value report
1,000 racks at PUE 1.60 · 27,375,000 facility kWh/yr
- 1 · Power savings through PUE optimization
- $1,839,600
- (PUE 1.60 − 1.25) × IT kWh × rate · target PUE 1.25
- 2 · Recoverable stranded power
- $1,051,200
- 1,000 kW recoverable × 8760h × rate
- 3 · Risk mitigation (avoided downtime + failures)
- $1,040,000
- 4h avoided ($40,000) + 1% MTBF extension ($1,000,000)
Total annual value
$3,930,800
Subscription payback at Pro $12/rack/mo ($144,000/yr): 0.4 months (reference benchmark: < 4 months).
Vertical add-ons (with sales)
- MSP / Colo — tenant billing accuracy from discrepancy rate × annual tenant revenue.
- Enterprise — compliance audit labor saved: manual hours × rate × 80% reduction.
- Crypto / AI — GPU thermal protection: GPU count × failure rate × unit cost.
- Edge — truck-roll avoidance: monthly rolls × dispatch cost × 90% reduction.
Vertical add-ons (scoped with sales)
- MSP / Colo — tenant billing accuracy from discrepancy rate × annual tenant revenue.
- Enterprise — compliance audit labor saved: manual hours × rate × 80% reduction.
- Crypto / AI — GPU thermal protection: GPU count × failure rate × unit cost.
- Edge — truck-roll avoidance: monthly rolls × dispatch cost × 90% reduction.